The Office of Physical Plant updates the Design and Construction Standards as needed to keep pace with changing technology and changes in University requirements.
Comments and proposed corrections or revisions are welcome from all users of the Standards and should be directed in writing via email to opp_es@ums.psu.edu.
All proposed changes to the Standards are reviewed by the Standards Coordinator and a Standards Team composed of technical experts representing a cross section of OPP.
Upon review and approval by the Standards Coordinator and Standards Team, a proposed revision will be implemented.
Significant changes to the Standards that have been implemented are recorded in the Revision Log. Note that the University does not record corrections of typographical errors, non-technical grammatical corrections, changes to Division 00, or changes to the Introduction to the Design Standards in the Revision Log.
The most recent revisions are highlighted on the right side of this page. To see a complete list of all revisions since the last archive, follow the link below to the Revision Log. At the Revision Log page, users can view the full text of each revision and can subscribe to an RSS feed to be notified of new changes in their news feed viewer.
Click Here to subscribe to Revision Log updates via RSS
PSU Design Standards Revisions Log
Older versions of the Design and Construction Standards are stored in the Archives folder. To view these archived versions, follow the link below.
Recently Updated
-
-
-
260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS-GUIDE SPECIFICATION-.docJan 18, 2021 • attached by Vanessa Rae Bierly
-
eAddendum_Template.rtfJan 13, 2021 • attached by Jeanne Fudrow
-
-
Discharages to Sanitary Sewer Systems.docxJan 13, 2021 • attached by Vanessa Rae Bierly
-
MASTER- PSU - Project Request Form-JOC- PDF.pdfJan 13, 2021 • attached by Jeanne Fudrow
-
Water Analysis and Testing for Closed Loop Systems.docxJan 12, 2021 • attached by Vanessa Rae Bierly
-
Water Treatment Test Control Limits.docxJan 12, 2021 • attached by Vanessa Rae Bierly
-
-
Sanitary Sewerage Utilites-4.docxJan 12, 2021 • attached by Vanessa Rae Bierly
-
Sanitary Sewerage Utilites.docxJan 12, 2021 • attached by Vanessa Rae Bierly
-
Request for Temporary Discharge Form.pdfJan 12, 2021 • attached by Vanessa Rae Bierly
-
Sanitary Sewerage Utilites-1.docxJan 12, 2021 • attached by Vanessa Rae Bierly
-
-
Addendum250000BASGuideSpecSeptember2019.docxJan 04, 2021 • attached by Vanessa Rae Bierly
-
Addendum-012020-250000BASGuideSpecSeptember2019.docxJan 04, 2021 • attached by Vanessa Rae Bierly
-
-
1-CM-GMP.pdfDec 09, 2020 • attached by Jeanne Fudrow
-
2C FOA EB.pdfDec 09, 2020 • attached by Jeanne Fudrow
-
DGS 1-C.pdfDec 09, 2020 • attached by Jeanne Fudrow
-
1-C.pdfDec 09, 2020 • attached by Jeanne Fudrow
-
2020_1123-GPC-Requirements.pdfNov 24, 2020 • attached by Vanessa Rae Bierly
-
-
2020_1123-GPC-Requirements.pdfNov 24, 2020 • attached by Vanessa Rae Bierly
-
2020.10.16 Roofscape Design Guide.pdfOct 27, 2020 • attached by Vanessa Rae Bierly
-
DGS_SCH20_ENVIRONMENTAL_STMT.pdfOct 12, 2020 • attached by Jeanne Fudrow
-
DGS SDBUR.xlsxOct 12, 2020 • attached by Jeanne Fudrow
-
Section D (DGS) General Conditions.pdfOct 12, 2020 • attached by Jeanne Fudrow
-
Section A (DGS).pdfOct 12, 2020 • attached by Jeanne Fudrow
-
-
DGS Exhibits A-H.pdfOct 12, 2020 • attached by Jeanne Fudrow
-
BR_Web_Form.xlsxOct 09, 2020 • attached by Jeanne Fudrow
-
-
NEWCM Web Project Form.pdfOct 09, 2020 • attached by Jeanne Fudrow
-
NEWWeb Project Form.pdfOct 09, 2020 • attached by Jeanne Fudrow
-
-
-
Addendum Template.rtfAug 25, 2020 • attached by Jeanne Fudrow
-
-
Application_Certificate of Payment -COP- Form -including Pencil Copy.xlsAug 24, 2020 • attached by Jeanne Fudrow
-
Application Certificate of Payment Form - COP 2-C (1).xlsxAug 24, 2020 • attached by Jeanne Fudrow
-
Section I PSU Construction COVID19.docxAug 21, 2020 • attached by Jeanne Fudrow
-
eB SECTION G.docAug 21, 2020 • attached by Jeanne Fudrow
-
eB Section A.docAug 21, 2020 • attached by Jeanne Fudrow
-
-
Certifications and Licensing Requirements.docxAug 19, 2020 • attached by Vanessa Rae Bierly
-
-
1-CM-A Agreement MASTER.pdfAug 13, 2020 • attached by Scott A Dainty
-
1-CM-GMP.pdfAug 13, 2020 • attached by Scott A Dainty